The chronological list of the technical jobs recently executed for TOTAL NIGERIA LIMITED (ELF Petroleum Nigeria Limited) by GO BETWEEN NIGERIA LIMITED :
Design and Fabrication of Baskets to hold 3 1/ 2 /4 1/ 2 X- Overs and Tubing: Work Order # W/DRI/2433/03 of 15th October 2003. Grit blasting and Painting of Some Fabricated Baskets: Work Order # W/DRI/2434/03 of 15th October 2003. Fabrication of platform for Amenam – Okpono project sub contract for Sing Nigeria Limited 2003.
Fabrication of Steel Sleeves using 3 1/ 2 Tubing at FLT – Onne: Work Order # W/DRI/066/04 of 15th January 2004. Design and Fabrication of Baskets to hold Flow head and Tools including MPI test, Surface Preparation and Painting: Work Order # W/DRI/0251/04 of 20th January 2004. |