The chronological list of the technical jobs recently executed for TOTAL NIGERIA LIMITED (ELF Petroleum Nigeria Limited) by GO BETWEEN NIGERIA LIMITED :

•  Design and Fabrication of Baskets to hold 3 1/ 2 /4 1/ 2 X- Overs and Tubing: Work Order # W/DRI/2433/03 of 15th October 2003.

•  Grit blasting and Painting of Some Fabricated Baskets: Work Order # W/DRI/2434/03 of 15th October 2003.

•  Fabrication of platform for Amenam – Okpono project sub contract for Sing Nigeria Limited 2003.

•  Fabrication of Steel Sleeves using 3 1/ 2 Tubing at FLT – Onne: Work Order # W/DRI/066/04 of 15th January 2004.

•  Design and Fabrication of Baskets to hold Flow head and Tools including MPI test, Surface Preparation and Painting: Work Order # W/DRI/0251/04 of 20th January 2004.

 

•  Fabrication of Baskets for TPC on OFON 25: Work Order # W/PRO/2464/04 of 4th March 2004.

•  Refurbishment of Drilling Basket (3 x 2 x 1m): Work Order # P/O 4560003210 of 12th July 2004.


•  Refurbishment of Drilling Basket (2m x 2m x 1m): Work Order # P/O 4560003211 of 12th July 2004.

•  Modification of DST 1 Basket (Welding/Padding of Floor/Painting): Work Order # 0000578 of 7th August 2004.

•  Basket Fabrication Services: Design, Purchase Materials & Fabricate Basket to Hold 2 Nos. Cementing Head & 2 Nos. Sub. (3m x 1.7m x1.2m) – Purchase Order # 4560011297 of 31st January 2005.